Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 20/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Grade | Condition |
Ultimate
Strength(Mpa)
|
Yield
Strength(Mpa)
|
Elongation(%)
|
Hardness HRB
|
4130 | HR | 621 | 483 | 20 | 89 |
SR | 724 | 586 | 10 | 95 | |
A | 517 | 379 | 30 | 81 | |
N | 621 | 414 | 20 | 89 | |
Grade | Condition |
Ultimate
Strength(Mpa)
|
Yield
Strength(Mpa)
|
Elongation(%)
|
Hardness HRB
|
4140 | HR | 855 | 621 | 15 | 100 |
SR | 855 | 689 | 10 | 100 | |
A | 552 | 414 | 25 | 85 | |
N | 855 | 621 | 20 | 100 | |
Grade | Condition |
Ultimate
Strength(Mpa)
|
Yield
Strength(Mpa)
|
Elongation(%)
|
Hardness HRB
|
4140 | HR | 855 | 621 | 15 | 100 |
SR | 855 | 689 | 10 | 100 | |
A | 552 | 414 | 25 | 85 | |
N | 855 | 621 | 20 | 100 |
Equivalent Material referance: | ||||||
GB | TOCT | ASTM | BS | JIS | NF | DIN |
10F | 1010 | 040A10 | XC10 | |||
10 | 10 | 10,101,012 | 045M10 | S10C | XC10 | C10,CK10 |
20 | 20 | 1020 | 050A20 | S20C | XC18 | C22,CK22 |
45 | 45 | 1045 | 080M46 | S45C | XC45 | C45,CK45 |
30CrMo | 30XM | 4130 | 1717COS110 | SCM420 | 30CD4 | |
42CrMo | 4140 | 708A42 | 42CD4 | 42CrMo4 | ||
708M40 | ||||||
35CrMo | 35XM | 4135 | 708A37 | SCM3 | 35CD4 | 34CrMo4 |
Material | 10#-45#, 16Mn, A53-A369, Cr-Mo alloy, Q195-Q345, ST35-ST52, 10#, 20#, 45#, 16Mn, A213, A315, 30CrMo, Q195, Q215, Q235, Q345, ST35, St37, St45, St52 |
Surface | Black/ Bright |
Standard | DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094- 2000, GB/T3639, JIS G3101 |
Size | OD 15mm-75mm |
Thickness 1-14mm | |
Processing | Cold rolled/ Cold drawn |
1. BK (+C) No heat treatment after last cold forming process. | |
2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing) | |
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. | |
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. | |
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. | |
Packing | Woven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. |
Delivery time | Normally 30-40 working days |
Q: Are you trading company or manufacturer?