Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Still deciding? Get samples of US$ 20/kg
Request Sample
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Customization from Samples
The supplier provides sample based customization services
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
IATF 16949
to see all verified strength labels (20)
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
  • Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Find Similar Products
  • Overview
  • Company Profile
  • Product Description
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
20# 1020 en10305 A519 seamless
Type
Seamless
Technique
Cold Drawn
Material
Carbon Steel
Surface Treatment
Oiled
Usage
Hydraulic/Automobile Pipe, Machinery Industry, Special Purpose
Section Shape
Round
IATF16949
Yes
Aoto Parts
Roll Cagae, Shock Absorber, Bushing
Motorcycle Parts
Frame, Steering Column
Mechanical Structure Pipe
Piston Pin
Transport Package
Bundle or Woven Packaging
Specification
15-75
Trademark
bluesky pipe
Origin
China
HS Code
7304319000
Production Capacity
50000 Ton/Year

Product Description

Company Profile

Fujian Bluesky Pipe Manufacturing Co., Ltd., originally celebrated as Zhejiang Bluesky Steel Pipe Manufacturing Co., Ltd., embarked on an exciting journey to its new location in Wendu Industrial Zone, Fuding in 2013. This expansive and strategic relocation spans an impressive area of 26,600 square meters,complemented by aconstruction area of 11,800 square meters. With over 30 years of expertise, we excel in producing high-quality seamless steel tubes and pipes.

Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber

Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock AbsorberReliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock AbsorberReliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Product Description
The process of manufacturing shock absorbers usually starts with selecting high-quality raw materials. The type of raw materials used can significantly affect the performance and lifespan of shock absorbers. Carbon steel seamless steel pipes and alloy seamless steel pipes are commonly used in the production of shock absorbers.These raw materials will undergo a series of processing steps. At these stages, accuracy is crucial to ensure that each component meets the precise specifications required to achieve optimal performance.
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber
Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber

 

GRADE chemical composition%
C Si Mn Cr Ni Mo Gu P S
20# 0.17~0.23 0.17~0.37 0.35~0.65 ≤0.25 ≤0.30 ---- ≤0.20 ≤0.035 ≤0.035
45# 0.42~0.50 0.17~0.37 0.50~0.80 ≤0.25 ≤0.30 ---- ≤0.20 ≤0.035 ≤0.035
40Cr 0.37~0.44 0.17~0.37 0.50~0.80 0.80~1.10 ≤0.30 ≤0.1 ≤0.20 ≤0.030 ≤0.030
40Mn2 0.37~0.44 0.17~0.37 1.40~1.80 ≤0.30 ≤0.30 ≤0.1 ≤0.20 ≤0.030 ≤0.030
37Mn 0.30~0.39 0.15~0.30 1.20~1.50 ≤0.35 ≤0.30 ≤0.1 ≤0.20 ≤0.020 ≤0.015
 
GRADE CONDITION
+C +LC +SR +A +N HRC
Rm A% Rm A% Rm Rel A% Rm A% Rm Rel A%
20# 550 5 520 8 520 375 12 390 21 410 245 25 ----
45# 645 8 ---- ---- ---- ---- ---- 590 14 600 355 16 ----
40Cr 780 10 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- 22~30
40Mn2 780 10 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- 22~30
37Mn5 780 12 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- 20~27
OD * ID Allowable deviation of outer diameter Allowable deviation of inner diameter
18*16       22*20     22.5*20  24*21  39.5*36 0/+0.1 0/+0.039
24*20       24*22     30*28   32*30
26.2*18    27.2*18   28.2*22.7 ±0.05 ±0.05
30.2*25    31.2*24 ±0.1
27.2*19    30.2*24   33.2*24   33.2*28   35.2*28   35.2*31    37.2*32     37.3*33 -0.15/-0.05
37.5*32     41.5*37   +0.05/+0.15
26.2*19     26.2*20   30.2*26   32.2*24     37.2*31   41.2*35.8 -0.25/-0.05
30.35*24     37.35*31 -0.1/0
Equivalent Material referance:
GB TOCT ASTM BS JIS NF DIN
20 20 1020 050A20 S20C XC18 C22,CK22
45 45 1045 080M46 S45C XC45 C45,CK45
40Cr   5140 41Cr4 SCR440 41Cr4/38Cr4  41Cr4/42Cr4
40Mn2   1340    SMn438   42Mn6
 37Mn5            
Material 10#-45#, 16Mn, A53-A369, Cr-Mo alloy, Q195-Q345, ST35-ST52, 10#, 20#, 45#,  16Mn, A213, A315, 30CrMo, Q195, Q215, Q235, Q345, ST35, St37, St45, St52
Surface Black/ Bright
Standard DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094- 2000, GB/T3639, JIS G3101
Size OD 15mm-75mm
Thickness 1-14mm
Processing Cold rolled/ Cold drawn
1. BK (+C)  No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled  atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the  upper transformation point in a controlled atmosphere.
Packing Woven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per  customer's request.
Delivery time Normally 30-40 working days
Our diverse range of delivery conditions includes options such as bright, galvanized, and phosphating finishes, ensuring versatility to meet your every need.
Certifications

Reliable IATF16949 Drawn Over Mandrel (DOM) Steel Tubing for Motorcycles Shock Absorber

FAQ

Q: Are you trading company or manufacturer?
A: We are professional manufacturer for steel pipes,and our company also is a very professional and technical foreign trade company for steel products. We have more export experience with competitive price and best after-sales service. Apart from this,we can provide a wide range of steel products to meet the requirement of customer.

Q:Will you delivery the goods on time?
A: Yes,we promise to provide best quality products and delivery on time no matter if the price change lot or not. Honesty is our company's tenet.

Q: Do you provide samples ? is it free or extra?
A: The sample could can provide for customer with free,but the freight will be covered by customer account. The sample freight will be returned to customer account after we cooperate.

Q: How can I get your quotation as soon as possible?
A: The email and fax will be checked within 24 hours,meanwhile,Wechat and WhatsApp will be online in 24 hours. Please send us your requirement and order information,specification(Steel grade,size,quantity,destination port),we will work out a best price soon.

Q: Do you have any certifications?
A: Yes,that's what we guarantee to our clients. we have IS09000,IATF16949 certinicate,ISO 14001 certificates etc.Our products are of high quality and we have professional engineers and development team.

Q: What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipmenit or paid against copy of B/L within 5 working days. 100% Irrevocable L/C at sight is favorable payment term as well.

Q: Do you accept the third party inspection?
A: Yes absolutely we accept.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier